Share

30 on Green Paving

30 on Green Paving

Project details

 

 

Project Goals

The developerforthe new residential development”30 on Green” in Bryanston required comprehensive civil works. Key objectives included paving the main driveway and unit pathways, alongside correcting drainage issues to ensure long-term pavement durability and safety.

 

Project Overview

Client: Private Developer
Location: 30 on Green, Bryanston,Johannesburg,
Project Duration:* 2 months
Completion Date:* February 2024

 

Scope of Work

The project involved

  1. Earthworks: Regrading surfaces to resolve drainage issues.
  2. Paving: Surfacing the main driveway and unit pathways.
  3. Drainage Solutions: Ensuring efficient waterflow away from paved areas.

Execution

Earthworks – ensure effective drainage

  • Site Analysis: Assessed the existing grading and identified drainage inefficiencies.
  • Surface Regrading: Adjusted the terrain to direct waterflow away from paved surfaces.
  • Subgrade Preparation : Prepared the ground beneath the paving to ensure a stable and robustfoundation.

Paving processes prioritised both functionality and aesthetics

  • Driveway Paving: Laid quality pavers along the main driveway ensuring durability and a smooth finish.
  • Unit Pathways: Installed matching pavers within unit pathways for a cohesive look and safe pedestrian access.

Drainage Solutions – to prevent water pooling

  • Drainage Channels: Installed drainage channels along the pathways and driveway to facilitate proper water run-off.
  • Water Flow Management: Ensured that all paving had the optimal slope to guide watertowards the drainage systems efficiently.

 

Outcome

The project at 30 on Green was completed on time,resulting in a beautifully paved development

  • Enhanced Functionality: The regraded surfaces and installed drainage effectively prevent water pooling.
  • Aesthetically Pleasing: The uniform paving throughoutthe driveway and pathways provides a polished and welcoming appearance.
  • Increased Safety: The new drainage solutions minimise the risk of water damage and related safety hazards.

 

Client Feedback

Excellent workmanship and timely delivery. They noted the dramatic improvementin both the functionality and appearance ofthe development’s paving.

 

Conclusion

The 30 on Green projectis a testament to our commitment to quality and attention to detail. Through meticulous planning and execution of earthworks and paving,the project not only met but exceeded client expectations, ensuring a safe, durable, and visually appealing result.